Kerry Foods (GTIC Naas)
Project Description
MedProGas completed design development, installation testing and commissioning to current BCGA / HTM Standards of specialist laboratory gases and Compressed Air Systems to new World Class Research and Development Centre.
New Primary Manifolds including High Purity degreased Stainless Steel services to
grade 6.0 / 99.9999% for specialist GC’s and Mass Spectrometers. Gases comprising of
O2 / Helium / CO2 / Nutritional Mix / Argon / Inert Mix MPG tied-in to free issued
Compressed Air Systems. Separate Gas Detection Systems for Inert and Flammable
Gases were installed (free issued to MPG) throughout.
Completed works tested / commissioned and handed over (on a phased basis) by MedProGas with the Client Nominated AP witnessing and signing off to BCGA standards.
Client
Kerry foods
Architect
In-house Kerry Foods
Engineering
Arup
Main Contractor
Mercury Engineering Ltd
Duration
16 Months