UCD – Conway Institute New Teaching Facilitys

R&D Laboratories

Project Description

This project was a major new build (5 storey over basement). MedProGas were engaged to offer design development of the primary lab gas services including primary distribution plant and gas detection systems to teaching and research, Lecture theatres & classrooms, Wet, Damp & Dry labs. This project was carried out on a Live 3rd level campus.

Services included: Hydrogen (Generator) / Manifold supplies for Oxygen / Grade 5.0 Air / HP and standard Nitrogen / CO2 / Vacuum was supplied by a Centralised Pump and some localised pumps (dealing with caustic systems)


Completed works tested/ commissioned and handed over (on a phased basis) by MedProGas with the Client Nominated AP witnessing and signing off to BCGA standards.

Client

UCD


Engineering

Varmings


Main Contractor

MESL Ltd


Duration

14 Months